Tuesday, March 17, 2009

Kitchen, laundry & Bathrooms take shape.







The Kitchen has been installed and looks fantastic we are thrilled about the layout and the colour. There has been mistakes made though. The top kitchen cabinets either side of the range hood are wrong, there should be three doors either side not four. They were also installed at the wrong height 700mm from the bottom bench and should be should be 600mm. The cupboard above the fridge is also incorrect there should be one door and there are two. I will have to speak to probie.

The laundry cabinet as well as the vanities have also been installed in the Bathroom and ensuite, again we are really happy with the colours we have chosen.
The laundry stainless steel sink which was an upgrade has been installed, all the other sinks have been delivered and are waiting to be installed.

The eves at the front facade have now all been covered in it is a shame that the quads are all not level!

They have moved the electrical cables from the inside of the brick pillars in the alfresco to the outer side which is correct, unfortunately they have now been pulled out at the top instead of the bottom!!! It will have to be third time lucky.

No comments: