Probie contacted me regarding our next door neighbours, they require dispensation for a 3300mm garage wall on the boundary of our two properties. We are going out tonight to see how far over it will come, if it only covers the window above our master bedroom we don't mind but if it cuts the light in our ensuite we will dispute it. I will ask if I can put some nails into the wall to hang my elkhorn and staghorn ferns.

They are also building with Porter Davis and have chosen the Atrium36 with the Daintree Facade. Now I am fairly sure I read in one of our contracts that you can not have the same facade as any of the nearing properties so I doubt that they are going to get a building permit approved. The last thing we want is that we end up looking like we live in a block of units.

Checked our bank accounts the payment went through without any problems.

Progress

Most of the windows have been installed together with the front door frame. The wrong master bedroom window was delivered so they will need to swap them over doh!

They have also started to put up the colorbond gutters and fascia. Most of it is completed but it seems they ran out or it went walk about!

More of the internal plumbing was done all the hot and cold water pipes have been run. The backyard water tap was in the wrong spot the other day but the plumbing Bob's picked it up and moved it, well done!