Monday, February 9, 2009

Brick laying begins




The brick laying Bob's have started laying bricks at our garage. The garage wall on the outer side on the perimeter of the property is little over halfway up. The wall together with the left column of the porch is also also started.

The second window in the home theatre has been installed as has the window above where our bed will be in the master bedroom. The front master bedroom window is still missing in action.

Half the green insulation has been ripped off by the strong winds.

The front door, garage door and laundry door have been delivered on site so I guess they will be put on soon. The cavity frame for the pantry has also been delivered.

No comments:

Post a Comment

Tell me what you think!