Bricky Bob has now laid the bricks to the roof line including the pillars to the portico and study walls. He has almost finished the master bedroom wall but was held up by the window just being installed, he has also set up to start on the master bedroom front veranda pillar. He has also laid more bricks to the alfresco pillars.
We have noticed that the electrical cable for the junction boxes on the pillars at the alfresco have been pulled out at the incorrect height 110cm and on the wrong side of the pillar facing inward to the alfresco, they should be 30cm at the base on the outer side of the pillars facing opposite the side fence. These points are to hard wire garden lights and I do not want them hanging off the middle of the pillar walls inside the alfresco. Not a good look I am sure you would will agree!