Fixed:
- The brick sills and front step all relaid without split bricks.
- Pier at portico bricks now straight.
- Cement sheet leveled above meter box.
- Fascia fitted closer to the walls removing gaps.
- Gutter at alfresco fixed.
- Roof tiles over master bedroom fitted properly.
- Bow removed from kitchen wall.
- Master bedroom window above bed has had trimmer installed.
- Flashing to alfresco door and front door installed.
- Front door replaced.
- Entry door quirk now level
- Garage door now level and plumb
- Toilet window now in the center.
Outstanding:
- Brick piers at left and right of garage to still be straightened.
- Mortar blow outs to be filled.
- Windows, repair dents (dining, rumpus, toilet), replace vinyls, fit aluminum angle to toilet window and replace front master bedroom window as the right hand small windows are not square.
- Quads still to be made level at front of house, quads will be replaced at alfresco with a wider quad and end beam will get covered in with cement sheet as it is rough.
- Front fascia over garage to be replaced, portico gutter to be replaced and study fascia to be adjusted.
- Fix reinforcement to dishwasher space for stone.
- Bottom of wall at games room still not plumb
- Flashing at laundry door will be removed and caulked instead.
- Sand and repaint bulkhead at entrance.
- remove bump from rumpus/alfresco wall, and unusual bump in ceiling in family room.
- Fix ceiling in alfresco where paint damaged by brick acid wash.
- Flashing at alfresco will be cut down.
- Bricks to be replaced at alfresco window (last 2 are raised). Also at alfresco pillar where they incorrectly drilled a hole to pull wire through and at the study pillar where a faulty brick was laid.
- Garage door needs to be repaired where someone has tried to break in.
- Study door needs to be repaired the bottom has a chip in it.
- Bed 2 wall damaged.
- Bed 4 wardrobe no handles
- Front door handel to be changed should be antique brass. SS has ordered a brass deadlock and will put it on our garage.
- Alfresco door damaged will be replaced.
- Touch up walls, eves and ceilings.
- Provide 4 extra handles 2 for laundry 2 for pantry.
- Caulk the basins with white not the clear silicone.
The electrician was also on site today and we asked if we could make the few little changes and they have agreed. We are getting a low voltage light installed at the poritco and one above each basin in the ensuite. We have lowered at the junction box at the front pillar of the master bedroom to use it for garden lights.