We are finally seeing things pick up pace on site. The data cable self confessed genius has been back and has installed the alarm although we can't make out if he has put the correct sensors in. All the data cables have been pulled out of the walls.
The Mirrors have been installed, the main bathroom one is slightly off center but we will get over it. The ensuite is a lot brighter with the mirror now installed but we have decided to add two extra low voltage down lights, one over each basin.
The down pipes are all getting connected.