The internal hangers and shelving in the wardrobes have been fitted. The shelving in the pantry has also been fitted leaving space for the cupboard being installed above the sink.
The new kitchen sink has also been installed as the old one walked off site.
The top four door cabinets in the kitchen have been replaced with three door units. They were supposed to be installed in the laundry and pantry but have been incorrectly removed from site. I have spoken to SS and he said they will be returned next week and installed.
There are a few errors with the electrical, there are para floodlights out the front of the property and there should be small ones with sensors. The master bedroom dimmer switch is in the wrong spot and the kitchen down lights are off centre. We are going to go back with our electrical drawings check the remaining electrical fit out.
Thursday, June 4, 2009