The tiling to the niche and splashback in the ensuite as well as the shower base of the main bathroom have all been completed and grouted. The only tiling that remains is at the rangehood when the cupboards finally get replaced.
I noticed damage to the wall backing on to the ensuite was damaged in bedroom 2. The plaster will have to be fixed and repainted.


Hi Miriam,
ReplyDeleteReally appreciate your blog. My wife and I are considering the Queenstown 36 so this has been a great education for us. Been a while since you updated. How things going?
Paul
Stay tuned I am updating now. Things have been a little slow but are now picking up again, we are about 8 weeks from handover. My friend has built a Q36 as well she removed the wall between the dining and lounge which really opened the place up. I recommend moving the dining wall to increase the space in the dining, I will use the lounge as second study or office. Good luck and I am glad that you are enjoying our blog.
ReplyDelete