Bricks have been relaid at the left wall of the garage and the left front pillar to the portico where the were originally laid on a slant. The front step and back window sill have been relaid without a split brick and look a heck of a lot better. The front door and door frame have also been sanded ready to be stained. They have also relaid the bricks at the toilet window to center it in the middle of the wall.
Friday, May 22, 2009
Bricks have been relaid.
Bricks have been relaid at the left wall of the garage and the left front pillar to the portico where the were originally laid on a slant. The front step and back window sill have been relaid without a split brick and look a heck of a lot better. The front door and door frame have also been sanded ready to be stained. They have also relaid the bricks at the toilet window to center it in the middle of the wall.