The hot water solar panel has been installed and the pipes have been run to the ensuite, I hope they will be finished off a little better than they have been. They have removed half a brick and the pipes are hanging out, they may just mortar around it which is not the finish I was expecting. I would have expected them to put proper fitting like the other pipes. I will speak to SS.
The colorbond down pipes have been installed and we are really happy with the colour of them as they seem to disappear rather than stand out. The colour we chose was jasper which is the same as the gutters. The back rollerdoor to the garage will also be the same colour.


No comments:
Post a Comment
Tell me what you think!